Sharaf DG Energy successfully extends Total Connected Load for a café located at Jumeirah 1.
The client faced difficulty after obtaining additional kitchen supplies in terms of not being able to utilize them due to lack of energy. Not being able to get total connected load extended through DEWA, the café’s owner had two options left – either getting a Diesel Generator or installing a Solar Off-Grid System.
Quick calculations show that the former option is both more sustainable and more cost-effective, and that’s where Sharaf DG Energy team took over a custom-design energy solution with the use of top-notch Victron Energy components and BYD batteries.